Delta Care Laboratory Reagents Factory
• Cleanroom / controlled rooms engineering (Class D) including humidity control to reach 20% RH where required.
• HVAC installation for controlled rooms: 4 AHUs, with HEPA filtration as applicable.
• BMS & EMS integration for monitoring and control of environmental parameters.
• Cleanroom construction works: partition installation to establish cleanroom areas (EDA approval scope).
• Cleanroom finishes: self-leveling flooring in production areas and warehouses; epoxy flooring/coating in filling halls.
• Walkable suspended ceiling panels for controlled areas.
• Utilities installation: compressed air distribution lines and steam lines across the controlled scope.
• PW system: new RO unit with UV/polishing (as applicable) and treated water distribution loop (PW loop).
• GMP & CAPA support to enable audit readiness and closure of observations.
• Access control system and door interlock installation for lockers.
• Approved engineering design aligned with Ministry requirements.
Key Achievements / Deliverables
• Delivered EDA-aligned controlled rooms (Class D) with stable environmental conditions and validated room segregation via partitions and interlocked access where required.
• Achieved stable humidity control down to 20% RH, supporting process and product requirements.
• Supported audit readiness through CAPA closure activities and a compliance-oriented engineering handover package.
• Fast execution with coordinated HVAC, utilities, PW loop, and finishes to minimize disruption and accelerate commissioning.